A Thoughtful, Three-Phase Plan
St. Joseph’s Church and Academy—America’s first SSPX foundation—is now bursting at the seams with 350+ faithful, including many growing families. At this pivotal time, we boldly embark on a historic relocation to our new 22.3-acre home in Armada, MI. Phase by phase, we will forge a thriving flagship campus: a K-12 academy for 200–350 students, a majestic church seating 500+, athletic fields, teacher residences, and a community center. Rooted in Tradition, we rise to welcome generations of faithful Catholics, creating an enduring refuge of community, Faith, and learning.

Projected Timeline: 1-3 Years
Projected Budget: 7.8-9.9M
Phase 1: Laying the Foundation
Spring 2026 – Fall 2028
Phase 1 is the urgent and practical first step that allows us to move forward immediately with confidence. With our 22.3-acre property in Armada now secured completely debt-free, we begin construction on the buildings that will relieve our most pressing overcrowding and enable us to begin education and worship on the new campus as quickly as possible.
What Will Be Built
-
A new school building designed to accommodate 200+ students, allowing the full transition from K-8 to a complete K–12 academy
-
A field house that will serve as a temporary sanctuary for Sunday Mass and community gatherings
-
Supporting infrastructure including parking lots, driveways, playground, pavilion, athletic playing field, and a versatile garage/storage barn
Why Phase 1 Comes First
We start here because our families need immediate relief — classrooms are overcrowded with two grades sharing each room, and the academy has the largest kindergarten class in its history. The field house also gives the parish a place to worship on the new property right away, allowing us to sell the current Ray Township facility and direct that equity into future phases.
Timeline
-
Spring 2026: Capital campaign launch, schematic design, and design development
-
Summer 2026: Construction documents and site preparation
-
Spring 2027: Land clearing and utility connections
-
Summer 2027: Construction begins
-
Fall 2028: New school opens and academy transitions to K–12; temporary chapel setup in the field house
Phase 1 gives our families the breathing room they need today and lays the strong physical and spiritual foundation for everything that follows — a true beginning of our new chapter in Armada
Phase 2: Building the Heart of the Campus
Winter 2028 - Summer 2031
Phase 2 is the exciting leap forward — the moment our vision truly becomes a permanent spiritual home and the campus begins to feel complete.